--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies


Three Gorges Project to Face Strenuous Tasks in Third Phase
The year 2003 will mark the start of three major functions of the gigantic Three Gorges project -- water storage, navigation and power generation.

Chi Wenjiang, spokesman of the State Council Three Gorges Project Construction Committee Executive Office, said on Wednesday that the start of operation in August of two power generating units, each with a capacity of 700,000 kilowatts, would mark the completion of the second phase and start of the third phase for the project.

From 2004 to the end of 2009, the project team will step up construction of the dam and power station workshops.

Most of the hydropower generating units and related high-voltage electrical apparatus would also be installed in this period, Chi said.

Chi said that over 400,000 people in the reservoir areas were awaiting relocation in the next six years, with an annual population movement equaling that of previous years.

Relocation of local farmers, reconstruction of cities and towns, as well as restoration of some special facilities and projects above the 135-meter level would demand strenuous work, said Chi.

The third phase of the project would involve further construction of power transmission and transfer facilities, including 3,100-kilometer alternating current lines, 2,000-kilometer direct current lines, as well as expansion in power transformer and inversion capacities, Chi said.

The second phase of relocation work, preparations for water storage and navigation trials through the perpetual ship lock have all passed inspection.

On June 1, 2003, the reservoir will start to store water, which will create a vast lake in the famous Three Gorges area. The ship lock will start trial operation as of June 16.

The Three Gorges Project is the largest hydropower project in the world. So far, the dam wall on the left bank has reached an altitude of 185 meters.

A concrete cofferdam for the third phase of construction has been completed.

According to official statistics, the project team has been building 4,374-kilometer alternating current lines, two direct current lines with a total length of 1,822 kilometers and 15 transformer substations, which will be able to meet the demand of the operation of the first-group power generating units this year.

By 2009 when the whole project is finished, the dam will boast 26 power-generating units with a combined capacity of 18.2 million kilowatts.

(Xinhua News Agency May 29, 2003)


China Steps up Efforts to Protect Three Gorges Environment
Three Gorges Project Closer to Completion
Monkeys Reappear in the Three Gorges Area
Three Gorges Project Sets up Safety Monitoring System
Three Gorges Migrants' Rights Respected: Official
Three Gorges Project Gears Up for Power Generation
Three Gorges Reservoir to Be Filled as Scheduled
Clean-up Campaign Urged for Three Gorges Reservoir
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 精品欧美一区二区三区精品久久| 91精品国产肉丝高跟在线| 美国式禁忌矿桥矿网第11集| 国内精品久久久久影院一蜜桃 | 美女黄频免费网站| 国产精品无码素人福利免费| 久久99国产精品成人| 欧美激情在线精品video| 免费人成在线观看视频高潮 | 亚洲国产欧美日韩| 永久免费视频v片www| 国产乱人伦app精品久久| 78成人精品电影在线播放日韩精品电影一区亚洲 | 色资源二区在线视频| 国产视频福利在线| 中文字幕久久久久| 最近中文字幕高清字幕8| 人妻仑乱A级毛片免费看| 都市激情校园春色亚洲| 国产综合色在线视频区| 三上悠亚在线观看视频| 最近免费中文字幕大全高清10| 亚洲最大成人网色香蕉| 欧美黑人vs亚裔videos| 亚洲视频在线不卡| 用劲好爽快点要喷了视频| 国产乱子伦片免费观看中字| 2015日韩永久免费视频播放| 少妇性俱乐部纵欲狂欢少妇| 久久婷婷国产综合精品| 欧美日韩亚洲国产一区二区三区| 午夜gif视频免费120秒| 香蕉视频黄色在线观看| 国产成人精品免费视频大全| 99re6在线播放| 成人做受120视频试看| 久久精品午夜福利| 曰批全过程免费视频网址| 亚洲欧美日韩久久精品第一区| 浮力影院第一页 | 99久久精品久久久久久清纯|