China Proposes Construction of 2nd West-east Gas Pipeline

China is planning to build another natural gas pipeline from the energy-rich West to the energy-thirsty East in the coming five years from 2006 to 2010.

The proposal was raised in the draft of Guidelines for the 11th Five-year Development Guidelines for National Economic and Social Development (2006-2010) submitted for examination and approval by the ongoing Fourth Session of the 10th National People's Congress  (NPC).

Still in feasibility research stage, there is no timetable yet for its construction, said Li Runsheng, spokesman of the China National Petroleum Corporation (CNPC), China's largest natural gas producer.

Whether or when it will be constructed depends on supply and demand in China's natural gas market, he said.

The unbalanced distribution of natural gas resources is outstanding in the country, said Tang Yali, vice president of the Natural Gas and Pipeline Company under PetroChina.

East and central China are experiencing rapid economic growth but also suffering shortage of energy.

Zhang Guobao, Vice Chairman of the National Development and Reform Commission (NDRC), said that China will increase its investment in the exploration of oil and gas resources of the Tarim Basin in Northwest China.

Huge gas reserves in China's West as well as increasing energy cooperation with the bordering countries make it feasible to build another west-to-east gas transmission pipeline, said Zhang.

An official with the CNPC said that the length, cost and the route of the new pipeline have not yet been decided.

But he said that the diameter of the second pipeline would be wider than that of the first west-east gas pipeline, which would demand much higher cost that the investment of 46 billion yuan (US$5.7 billion) for the first one, he said.

China plans to raise the ratio of natural gas in its total energy consumption to about 8 percent to 10 percent by 2010, instead of the existing 3 percent to 5 percent.

The first massive project to pipe natural gas from the west to the east was put into commercial operation at the end of 2004, starting from the Tarim Basin of northwest China's Xinjiang and arriving in east China's Shanghai.

The pipeline extending 4,000 km traverses 10 provinces, autonomous regions and municipalities, with designed annual gas transmission capacity of 12 billion cubic meters, which can ensure a stable gas supply of 30 years.

(Xinhua News Agency March 11, 2006)


Print This Page E-mail This Page Return To Home

Copyright ? China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-88828000

主站蜘蛛池模板: 日本韩国视频在线观看| 爱做久久久久久| 国产成人无码精品一区不卡| 99热在线只有精品| 性做久久久久久蜜桃花| 久久亚洲春色中文字幕久久久| 欧美亚洲第一页| 亚洲精品无码久久久久久| 精品国产无限资源免费观看| 国产亚洲一区二区三区在线观看| 国产在线精品网址你懂的| 国产精品视频全国免费观看| a一级日本特黄aaa大片| 少妇高潮太爽了在线视频| 中日韩精品电影推荐网站| 日韩欧美国产三级| 亚洲av无码不卡久久| 欧美国产激情二区三区| 亚洲欧美日韩小说| 激性欧美激情在线| 先锋影音男人资源| 精品久久欧美熟妇WWW| 午夜视频在线免费| 羞羞视频网站免费入口| 国产专区中文字幕| 青青草97国产精品免费观看| 国产性生交xxxxx免费| 久久综合久综合久久鬼色| 国产精品久久久久毛片真精品| 5g影院天天爽爽| 国产香蕉国产精品偷在线| 99ri国产在线| 在线网站你懂得| 99热这里有免费国产精品| 天天拍天天干天天操| japanese21hdxxxx喷潮| 好大好猛好深好爽视频| 一区二区三区杨幂在线观看| 精品无人区无码乱码毛片国产| 国产丰满麻豆videossexhd| 韩国电影吃奶喷奶水的电影|