Tools: Save | Print | E-mail | Most Read
China Mulling Construction of 2nd West-East Gas Pipeline
Adjust font size:

China is planning to build another natural gas pipeline from the energy-rich West to the energy-thirsty East in the coming five years from 2006 to 2010.

 

The proposal was raised in the draft of Guidelines for the Eleventh Five-Year Development Plan for National Economic and Social Development (2006-2010) submitted for examination and approval by the ongoing Fourth Session of the 10th National People's Congress (NPC).

 

Still in feasibility research stage, there is no timetable yet for its construction, said Li Runsheng, spokesman of the China National Petroleum Corporation (CNPC), China's largest natural gas producer.

 

Whether or when it will be constructed depends on supply and demand in China's natural gas market, he said.

 

The unbalanced distribution of natural gas resources is outstanding in the country, said Tang Yali, vice president of the Natural Gas and Pipeline Company under PetroChina.

 

East and Central China are experiencing rapid economic growth but also suffering shortage of energy.

 

Zhang Guobao, Vice Chairman of the National Development and Reform Commission (SDRC), said that China will increase its investment in the exploration of oil and gas resources of the Tarim Basin in Northwest China.

 

Huge gas reserves in China's West as well as increasing energy cooperation with the bordering countries make it feasible to build another west-to-east gas transmission pipeline, said Zhang.

 

An official with the CNPC said that the length, cost and the route of the new pipeline have not yet been decided.

 

But he said that the diameter of the second pipeline would be wider than that of the first west-east gas pipeline, which would demand much higher cost that the investment of 46 billion yuan (US$5.7 billion) for the first one, he said.

 

China plans to raise the ratio of natural gas in its total energy consumption to about 8 percent to 10 percent by 2010, instead of the existing 3 percent to 5 percent.

 

The first massive project to pipe natural gas from the west to the east was put into commercial operation at the end of 2004, starting from the Tarim Basin of Northwest China's Xinjiang and arriving in East China's Shanghai.

 

The pipeline extending 4,000 km traverses 10 provinces, autonomous regions and municipalities, with designed annual gas transmission capacity of 12 billion cubic meters, which can ensure a stable gas supply of 30 years.

 

(Xinhua News Agency March 11, 2006)

 

Tools: Save | Print | E-mail | Most Read

Related Stories
Oil Pipeline Projects in W. China to Be in Operation
Major Pipelines to Ease Energy Shortage in Five Years
Oil Pipeline in Guangdong Ready for Operation
Oil Pipeline Links China, Kazakhstan
Private Pipeline to Import Russian Oil
Gas Pipeline to Be Completed on Schedule

Product Directory
China Search
Country Search
Hot Buys
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號
主站蜘蛛池模板: 国产精品高清一区二区三区| 成人午夜精品视频在线观看| 亚洲欧洲高清有无| 精品久久久久久国产牛牛app| 国产在线麻豆精品观看| 天堂中文www资源在线| 国语free性xxxxxhd| va亚洲va欧美va国产综合| 精品国产乱码久久久久久浪潮 | 久草福利在线观看| 欧美伊香蕉久久综合类网站| 亚洲精品国产高清嫩草影院| 高潮毛片无遮挡高清免费视频| 国产精品国产亚洲精品看不卡 | 91精品免费看| 在线电影中文字幕| yellow中文字幕网| 很狠干线观看2021| 中文亚洲av片不卡在线观看 | 成人福利app| 丰满少妇被猛男猛烈进入久久| 日韩a在线播放| 久久综合精品国产二区无码| 欧美一区二区在线观看免费网站| 亚洲成AV人片在WWW色猫咪| 毛片大全免费看| 亚洲精品美女视频| 色噜噜视频影院| 国产午夜av秒播在线观看| 91啦在线视频| 国产成人精品综合在线观看| h视频在线观看免费完整版| 国产精品成人h片在线| 51影院成人影院| 国产精品视频视频久久| 91精品久久久久| 国农村精品国产自线拍| 中文字幕乱码中文乱码51精品| 日本免费xxxx色视频| 久久人人爽人人爽人人av东京热| 日韩在线不卡免费视频一区 |