--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies

West-east Gas Pipeline to Be in Operation

A 3,900-kilometer-long natural gas pipeline that spans across the breadth of the country is scheduled for completion and commercial operation by the end of this year, according to Vice-Minister Zhang Guobao of the State Development and Reform Commission in Beijing Monday.

The mammoth project, which starts in the Tarim basin of the Xinjiang Uygur Autonomous Region in northwest China and ends in the east China coastal city of Shanghai, is part of the efforts of the country to make full utilization of the rich resources in the western part of the country and ease energy-hunger in the economically developed eastern part.

The eastern part of the pipeline, which refers to the 1,500 kilometers from Jingbian in northern Shaanxi to Shanghai, was completed by the end of last year and has begun to supply natural gas to Shanghai from January 1, 2004, Zhang told a press conference as sidelines of the annual session of China's top legislature.

During the icy cold winter, Shanghai got a supply of 1.1 million cubic meters every day," Zhang said.

Welding for the 2,400 kilometer western part of the project has been completed and the joints across the Yangtze and Yellow rivers have also been completed, encountering no problems that affect the schedule of the entire project, he noted.

"At the current progress, the whole pipeline can been put into test run by October this year and by December 31, natural gas will flow from the Tarim Basin in Xinjiang to Shanghai and Zhejiang Province," he said, adding that that means the project is completed one year ahead of schedule, a speed that has never attained in the history of pipeline laying in the world.

Zhang revealed that gas supply contracts have been signed with more than 20 major downstream gas users (one city is countered as one user), with a total amount reaching 6.957 billion cubic meters.

The design and building of the project have the participation of foreign experts and engineering personnel as well as supervisors. All the project was open to international competitive bidding.

"We encourage the China National Petroleum Corporation, the owner of the project, to keep in contact with foreign companies and negotiate on joint operation of the project," he said.

(Xinhua News Agency March 8, 2004)

Shanghai Gets Gas from Pipeline Project
Largest Gas Pipeline Project Ready for Trial Run
Key Section of West-east Gas Project Completed
East-West Gas Project on Track
Gas Pipeline Runs over 4,000 km Across China
West-East Gas Project
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 成年日韩片av在线网站| 欧美深夜福利视频| 国产人成精品香港三级古代| 伊人性伊人情综合网| 处女的诱惑在线观看| 一本大道香蕉大无线视频| 日日碰狠狠添天天爽五月婷 | 国产人成精品香港三级古代| 国产精品自产拍在线观看| AV无码久久久久不卡网站下载| 帅教官的裤裆好大novels| 中文字幕最新在线| 日本护士XXXXHD少妇| 久草视频福利资源站| 欧美一级片在线| 亚洲日韩中文字幕一区| 波多野结衣av无码| 交换交换乱杂烩系列yy| 痴汉の电梯在线播放| 动漫无遮挡在线观看| 美团外卖猛男男同38分钟| 国产AV一区二区精品凹凸| 野战爱爱全过程口述| 国产在线一卡二卡| 麻豆文化传媒精品免费网站 | 丰满少妇被猛烈进入无码| 日本中文字幕在线精品| 久久国产免费观看精品3| 日韩高清在线免费观看| 亚洲av之男人的天堂网站| 欧美三级视频网站| 亚洲人成网站18禁止久久影院| 欧美成人性色生活片| 亚洲国产香蕉视频欧美| 欧美色图另类图片| 亚洲熟女乱色一区二区三区| 浮力影院国产第一页| 亚洲高清美女一区二区三区| 狠狠色综合久久婷婷| 亚洲色大成网站www永久男同| 狂野欧美激情性xxxx|