Home / English Column / Environment / Environment -- What's New Tools: Save | Print | E-mail | Most Read
Dam of Three Gorges Project Near Completion
Adjust font size:

The concrete pouring for the dam on the right bank of the Three Gorges Project has entered the final phase, and the full completion of the Three Gorges Dam is coming soon.

The concrete pouring for the 2309-meter-long dam, with a total concrete amount of 16.1 million cubic meters started in 1998. In 2002, the concrete pouring for the dam on left bank was completed. The workers began to pour concrete for the right dam in July 2003.

The concrete gravity dam is 181 meters high, 15 meters wide at the top and 185 meters wide at the bottom. The axis of the dam is 2,309 meters long.

(People's Daily April 24, 2006)

 

Tools: Save | Print | E-mail | Most Read

Related Stories
China Showcases Success of Dam Resettlement
Limit on Tourist Numbers at Three Gorges Dam
Gov't to Audit Three Gorges Dam Project
Tourist Reception Center to Be Built at Three Gorges
 
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號
主站蜘蛛池模板: 一个人看的www免费高清中文字幕 一个人看的www免费高清中文字幕 | 最近最新2019中文字幕高清| 亚洲色无码国产精品网站可下载| 羞羞视频免费网站在线看| 国产国产人免费人成免费视频| xxxx69中国| 欧美日韩国产成人综合在线| 免费精品久久天干天干| 美女视频黄频a免费| 国产亚洲精品aa片在线观看网站| 国产成人精品怡红院| 国产精品久久国产精品99| 91精品视频在线| 多女多p多杂交视频在线观看| youjizz护士| 尤物网址在线观看日本| 中文字幕成人乱码在线电影| 日本三级香港三级人妇m| 久久精品国产亚洲| 最新中文字幕一区二区乱码| 亚洲一区二区三区无码中文字幕 | 69女porenkino| 手机在线看片国产日韩生活片| 久久精品久久精品| 日韩精品久久一区二区三区| 亚洲а∨天堂久久精品| 欧美性受xxxx白人性爽| 亚洲欧洲另类春色校园网站| 正在播放国产美人| 亚洲熟妇无码爱v在线观看| 波多野结衣潜入搜查官| 四虎成人精品在永久免费| 蜜桃精品免费久久久久影院| 国产夜趣福利免费视频| 99re在线视频播放| 多人伦精品一区二区三区视频| a级毛片在线视频免费观看| 天天做天天躁天天躁| a级毛片100部免费观看| 天天干天天干天天干天天干 | 国产精品亚洲欧美大片在线观看 |