--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
SPORTS
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Film in China
War on Poverty
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service
China Calendar
Telephone and
Postal Codes


Hot Links
China Development Gateway
Chinese Embassies

32 Power Plants Ordered to Stop Construction

On July 15, four state bodies jointly ordered a halt to the construction of 32 power stations, 10 and 11 of which are in Henan Province and Inner Mongolia Autonomous Region respectively, because they do not meet environmental and other national standards

The National Development and Reform Commission (NDRC), the State Environmental Protection Administration and the ministries of land and resources and water resources announced that problems with the plants included illegally drawing groundwater.

The NDRC said these projects breached rules and regulations concerning land requisition, environmental protection, and water and soil preservation, so could not be included in China’s short-term power development planning.

With a total planned capacity of 17.114 million kilowatts, the power stations required investment of 85.5 billion yuan (US$10.5 billion), with 20 billion yuan (US$2.46 billion) already spent.

“Letting their construction continue would not only adversely affect the development of the power industry, but would also bring about risks to the financial sector, influencing sustainable economic development,” said an NDRC official.

In February, the General Office of the State Council called on government departments to put a stop to the building of illegal power stations, saying that they would “disturb implementation of the state’s overall energy strategy, causing chaotic power construction and contradictions between coal supply and limited transportation capacity.”

At that time, according to the NDRC, illegal power station projects had a total capacity of 125 million kilowatts. They had no approval for their feasibility reports, had not applied for examination or approval, or had not suspended construction after being instructed to previously.

The NDRC said all the stations should stop construction and planning immediately and local departments take up their responsibilities in dealing with any remaining problems.

Power plant projects have become attractive to many localities as a source of inward investment. Along with an increase in demand for electricity, this has encouraged their construction even when regulations have not been met.

(China Business News translated by Zhang Tingting for China.org.cn July 28, 2005)

Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright ©China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 扒下老师的黑色丝袜桶她| 人人人妻人人澡人人爽欧美一区| 亚洲a视频在线观看| 美女扒开尿囗给男人玩的动图| 护士撩起裙子让你桶的视频| 亚洲av无码一区二区三区性色| 精品国产a∨无码一区二区三区| 国产激情一区二区三区在线观看| 一区二区高清视频在线观看| 未满十八18禁止免费无码网站| 午夜dj在线观看免费视频| 性xxxxbbbb| 女扒开尿口让男桶30分钟| 久久精品国产一区二区三| 深夜a级毛片免费视频| 国产免费一区二区三区在线观看 | 在车上狠狠的吸她的奶| 久久人人妻人人做人人爽| 欧美高清在线视频在线99精品| 周妍希美乳三点尽露四季图片| 色聚网久久综合| 好男人在线社区www| 久久婷婷激情综合色综合俺也去| 波多野结衣三人蕾丝边| 国产一区二区三区在线观看影院 | 一级黄色香蕉视频| 国产香蕉视频在线| 一级毛片恃级毛片直播| 日韩精品一区二区三区老鸦窝 | 大量精子注入波多野结衣| 久久久久人妻精品一区三寸蜜桃| 欧美换爱交换乱理伦片老| 午夜久久久久久久| 综合色在线观看| 国产成人免费手机在线观看视频| 99精品国产高清一区二区| 手机在线观看精品国产片| 久久一日本道色综合久久m| 欧美v在线观看| 亚洲精品无码久久久久久| 综合久久给合久久狠狠狠97色|