--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
THIS WEEK
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies

China Resolves Technical Problems in Building Qinghai-Tibet Railway
China has succeeded in solving a series of technical problems in building the Qinghai-Tibet railway, the highest railway in the world.

Chinese railway builders and scientists have developed effective ways, based on experimentation and experience in constructing the railway in the past year, to treat major problems like highland cold, water and oxygen shortages, and frozen earth.

The 1,118-km (695-mile) railway will extend from Lhasa, capital of the Tibet Autonomous Region in southwest China, to Golmud in Qinghai Province in the northwest.

More than 960 kilometers (597 miles), or over four-fifths, of the railway will be built at an altitude of more than 4,000 meters (13,123 feet) and 547 kilometers (340 miles), or more than half of its total length, will be laid onlong-frozen earth.

To guarantee the stability of the railroad bed and the safe operation of the railway, scientists and builders have tried to avoid laying rails in areas with severely frozen earth, and built bridges over some areas where the frozen earth is unstable, or ventilation dykes and paved layers to preserve the frozen earth.

A research report by the Xibei (northwest) Science Research Institute under the China Railway Engineering Corporation shows that thermosiphons are expected to help resolve problems resulted from the frozen earth.

The report said experiments showed the use of thermosiphons to cool the railway bed was feasible.

Experts explained that thermosiphons transmit heat in one direction, which means heat will be transmitted from underground to the surface, but cannot be transmitted from the surface to below ground.

Wide use of thermosiphons could help preserve the frozen earth,they said.

Chinese scientists started research on the frozen earth as early as since the early 1960s.

Experiments involving new technologies, techniques and materials are going well in five frozen earth areas along the railroad.

Meanwhile, breakthroughs have been made in solving shortages of oxygen and water.

No deaths caused by pulmonary edema and cerebral edema, the aftermath of oxygen shortage at altitude, have been reported on the construction site since the railway project was launched one year ago.

China has been considering building the Qinghai-Tibet railway for more than five decades. Rapid economic growth and technological advances over the past two decades have made the project possible.

Upon completion in six years, the railway will end a history of the Tibet Autonomous Region being inaccessible by train.

(People's Daily July 13, 2002)

Government to Spend US$42 Billion on Railway Construction
World-roof Railway Project Continues in Winter
Construction of Qinghai-Tibet Railway Starts
Qinghai-Tibet Railway to Advance 100 KM
Experts Reveal How to Build World's Top Railway
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 天天干天天干天天天天天天爽| 乡村乱妇一级毛片| 一本久到久久亚洲综合| 欧美老熟妇欲乱高清视频| 在线中文字幕网| 久久精品99无色码中文字幕| 男女午夜特黄毛片免费| 国产欧美日韩精品第一区| 一级毛片试看三分钟| 欧美日韩中文国产va另类| 国产乱码精品一区二区三区中文| A级国产乱理论片在线观看| 日韩在线视频一区二区三区| 免费网站看v片在线a| h在线观看视频免费网站| 护士又湿又紧我要进去了| 亚洲男人天堂2017| 黑森林av福利网站| 手机看片福利日韩国产| 久久精品国产成人AV| 粗大的内捧猛烈进出视频| 国产精品无码无卡无需播放器| 久久久久久国产精品免费免费男同| 第四色播日韩第一页| 国产特级毛片aaaaaaa高清| 一级黄色香蕉视频| 欧美va亚洲va国产综合| 四虎a456tncom| 97日日碰人人模人人澡| 欧美大黑bbb| 国产性片在线观看| 一级毛片**免费看试看20分钟| 日本特黄高清免费大片爽| 免费播放特黄特色毛片| 日韩精品一区二区三区老鸭窝 | 无码h黄肉3d动漫在线观看| 亚洲精品亚洲人成在线| 香蕉久久夜色精品国产| 天天看片天天操| 久久精品国产亚洲AV高清热 | 好男人资源在线观看好|